![london olympic aquatic centre london olympic aquatic centre](https://c8.alamy.com/comp/GCM475/general-view-of-the-olympic-aquatic-centre-which-is-currently-under-GCM475.jpg)
Areas surrounding the pool that would be subject to heavy foot traffic received an application of ARDEX EB 2™ Fast Setting Screed Cement, providing a strong and flat surface that could be tiled in just hours, as opposed to days as with a traditional sand and cement screed.
#London olympic aquatic centre crack
Shower areas and changing rooms were prepared with ARDEX 8+9™ Rapid Waterproofing and Crack Isolation Compound, providing an easy to apply rapid waterproof protection coat where tile was able to be installed in just 90 minutes. See more ideas about london aquatics centre, zaha hadid, zaha.
#London olympic aquatic centre full
ARDEX FL™ Rapid Set, Flexible, Sanded Grout Dove Grey with a high level of flexibility and ease of application gave the pool attractive, full grout joints. Explore Aquatics Internationals board '2012 London Olympic Aquatic Centre', followed by 223 people on Pinterest. A one mortar solution with a creamy consistency, no sag properties and outstanding coverage allowed installers to work more quickly and efficiently.
![london olympic aquatic centre london olympic aquatic centre](http://designapplause.com/wp-content/xG58hlz9/2014/02/ZHA_Aquatics-legacy013.png)
Due to this past expertise and only needing to specify just one manufacturer for the entire installation, ARDEX was awarded this prestigious project by delivering overall reduced costs and time savings due to high performance systems solutions.ĪRDEX X 77™ MICROTEC ® Fiber Reinforced Tile and Stone Mortar was selected for fixing all of the approximately 866,000 tiles specified for the Aquatic Centre. S&P Architects – North Lincolnshire, United KingdomĪRDEX Tile and Stone Installation Systems have been specified in many high-profile swimming pools. General Contractor: Balfour Beatty – London, United Kingdom Tile Contractor: W B Simpson Limited – Redhill Surrey, United Kingdom The 260,000 square-foot Olympic Aquatic Centre required a proven tiling solution which could deliver fast track completion, as well as the ability to withstand the challenging environment within the centre during construction including rigorous hygiene demands. Architects, Interior Designers, Engineers.All containing around 2,641,720 gallons of water. The Olympic Aquatic Centre will house two 50m swimming pools (1 for competition and 1 for warm ups) and a 25 m diving pool. Systèmes de gestion du béton ARDEX (ACMS) Ironic since the 2012 London Olympics mark the return of the open-water swim event to the Olympic schedule.Systèmes de réparation de béton modifié (ECRS).Systèmes d’installation de carreau et de pierre.Apprêts, réparations de fissure/joint et additifs.